With the floor in place we took down the rest of the ceiling in the addition.
We used two different insulation, one with a vapor barrier and one without. During the process we also roughed in the electrical.
Once the ceiling was done we moved to the walls.
Above: half of the walls electrical is roughed in and ready for insulation. and then my phone didn't keep the rest of the pictures. Leading me to think that maybe phones should be trusted to take pictures. Dad and I finished up this wall with wires and insulation late yesterday. Bryna and I got the west wall done so it is ready for wires and insulation and the plumber started making repairs today.
The toilet upstairs is sitting on flooring worse than we thought so we are going to take a look at fixing that sub floor before we work on the pocket door.

No comments:
Post a Comment