There were two holes between the living room and dining room. Bryna and I originally projected that built-in cabinets had been here when we uncovered them during the carpet removal.
Since then we weren't as sure, they could have been made when upgrading to a forced air system. Upon some investigation, the one that was a cold air return wasn't doing much.
I decided we could add a new cold air return to the kitchen and we removed the awkward one at the bottom to the stairs.
Leaving a gaping hole in the floor. Bryna went to the restore to pick up other old maple boards. They were the perfect groove shape but too wide so the next morning I picked up a table saw.
The first step was prepping the holes, we didn't want all of the new boards to end on the same line. This including planning where they would end, based on the length of the new boards and any defects, like cracks holes or discoloration. Drilling holes (holy schmoley) and lots of chiseling.
Until after hours (a lot of them) we had the holes the shape that we wanted them.
Then we had to clean up around the edges of the sub floor. I am not very talented with saws.
John and Bryna made their hole much nicer. I have a lot to work on.
Create new supports for the sub floor
replace the sub floor
and finally cover the holes with the boards that needed like 10 cuts to make them the right size. One for width, 2 to make the new groove, 2 to trim down the tongue, 1 to length... OK that is only 6, but it sure felt like ten, there were a lot of boards.
The red paper was used to make the floor level.
WOW, I am still amazed by this picture, and the hole covering. The floor feels solid and three is only one squeaky board.
oh my goodness this was a long project.
We were a little bit slap happy by 10pm Saturday night and discovered that old maple saw dust can me molded into snow balls and made into snowmen.
But the floors look amazing. Then they
just have to be sanded down...